Skip to content
Agradium

Free template

Free Submittal Log Template for Architects (Excel)

On the architect's side, a submittal log tracks a review, not a procurement schedule. This template logs each submittal by specification section, item and revision, follows it to your consultants and back, and records the action on your stamp.

Download the Excel file

Free · .xlsx for Microsoft Excel · No sign-up

What's in the file

One log tab and a Summary tab. Each column heading in the file carries the same note as below.

ColumnWhat goes in it
Spec SectionThe specification section, for example 08 71 00.
Item #The item within that section: 1, 2, 3…
Rev.0 for the first submission. A resubmittal gets a new row with the next number.
DescriptionWhat was submitted: shop drawings, product data, samples.
ReceivedThe date the submittal reached your office. Leave blank while it is only expected.
DueCalculated: the received date plus the review time on the Summary tab.
ConsultantThe consultant who reviews it, if it isn't your office.
Sent to ConsultantThe date you forwarded the submittal.
Back From ConsultantThe date the consultant's review came back.
ReturnedThe date you returned the reviewed submittal to the contractor.
Review ActionThe action on your stamp. Revise and Resubmit or Rejected means a new revision is coming. Dropdown: Approved, Approved as Noted, Revise and Resubmit, Rejected, Not Reviewed.
Days in ReviewCalculated: days from received to returned, or to today while in review.
StatusCalculated: In review, With consultant, Overdue or Returned.

How to use it

  1. On the Summary tab, enter the project and the review time your specifications allow.

  2. Log each submittal when it arrives, by spec section, item number and revision 0.

  3. Record the dates it went to a consultant and came back.

  4. When you return it, enter the date and the review action from your stamp.

  5. For a resubmittal, add a new row with the same section and item and the next revision number. Keep the earlier row as history.

When the spreadsheet gets busy

Agradium logs submittals by spec section, item and revision, records the review action, and keeps every revision's history. Review times and overdue submittals are calculated, never typed.

Questions

Frequently asked questions

What does approved as noted mean?

The submittal is acceptable with the corrections marked on it, and the contractor may proceed with those corrections without resubmitting. Firms word the same actions differently, such as "no exceptions taken" for approved and "make corrections noted" for approved as noted. Edit the dropdown to match your stamp.

What is the difference between revise and resubmit and rejected?

Revise and resubmit means the submittal needs corrections you must see before the work proceeds. Rejected means it does not meet the contract documents and must be replaced. Either way the contractor sends a new revision, which gets its own row in the log.

Why log each revision on its own row?

Each revision is a separate review with its own dates and action. Separate rows show how many rounds a submittal took and how long each one sat with you.

Keep going

Excel workbook · 11 tabs

Construction Administration Log

Every log in one workbook, with a summary of what is open, what is overdue and the contract sum to date.

Free download

Excel

RFI Log

Due dates, consultant hand-offs, days open and overdue flags, calculated for you.

Free download

Excel

Change Order Log

The contract sum and completion date to date, counting only fully signed change orders.

Free download

See your next project in Agradium.

A 30-minute walkthrough, from the first RFI to a signed change order.

Request a demo