Punch List Template for Architects (Excel)

At substantial completion, the contractor lists the work that remains, and the architect inspects and adds to it. This template keeps each item by room and location, who owns it, when the contractor says it is done, and when you verified it.

Download the Excel file

Free · .xlsx for Microsoft Excel · No sign-up

What's in the file

One log tab and a Summary tab. Each column heading in the file carries the same note as below.

ColumnWhat goes in it
Item #Number items in the order you write them.
RoomRoom number, if any.
LocationArea, level or grid line.
DescriptionWhat must be completed or corrected.
ResponsibleThe trade or subcontractor who owns the item.
CorrectedThe date the contractor reports the item complete.
VerifiedThe date the architect checked it and closed it.
StatusCalculated: Open, Ready for check (corrected, not verified) or Closed.

How to use it

  1. On the Summary tab, enter the project name and number.

  2. Add a row for each item during the walk-through: room, location, description and the responsible trade.

  3. Share the list with the contractor. As items are finished, enter the date each one is reported corrected.

  4. Back-check each corrected item on site and enter the date you verified it. The status turns Closed.

  5. Filter by Responsible to give each trade its own list, or by Status to plan the next back-check.

When the spreadsheet gets busy

Agradium keeps punch items by room and location, with correction dates and the architect's check-off at the end of the job, in the same record as the project's RFIs, submittals and changes.

Questions

Frequently asked questions

Who creates the punch list?

Under most standard contracts, the contractor prepares the list of incomplete work when it considers the project substantially complete. The architect then inspects, adds what the contractor missed, and verifies each item once it is corrected.

What is the difference between corrected and verified?

Corrected is the contractor's word that an item is done. Verified is your confirmation on site. Keeping both dates shows which items are waiting for your back-check.

Can I print it?

Yes. Each log tab prints in landscape, one page wide, with the column headings repeated on every page.

Keep going

Excel workbook · 11 tabs

Construction Administration Log

Every log in one workbook, with a summary of what is open, what is overdue and the contract sum to date.

Free download

Excel

RFI Log

Due dates, consultant hand-offs, days open and overdue flags, calculated for you.

Free download

Excel

Submittal Log

Logged by spec section, item and revision, with review actions and review times.

Free download