Construction Administration Log
Every log in one workbook, with a summary of what is open, what is overdue and the contract sum to date.
Free download
Free template
At substantial completion, the contractor lists the work that remains, and the architect inspects and adds to it. This template keeps each item by room and location, who owns it, when the contractor says it is done, and when you verified it.
Free · .xlsx for Microsoft Excel · No sign-up
One log tab and a Summary tab. Each column heading in the file carries the same note as below.
| Column | What goes in it |
|---|---|
| Item # | Number items in the order you write them. |
| Room | Room number, if any. |
| Location | Area, level or grid line. |
| Description | What must be completed or corrected. |
| Responsible | The trade or subcontractor who owns the item. |
| Corrected | The date the contractor reports the item complete. |
| Verified | The date the architect checked it and closed it. |
| Status | Calculated: Open, Ready for check (corrected, not verified) or Closed. |
On the Summary tab, enter the project name and number.
Add a row for each item during the walk-through: room, location, description and the responsible trade.
Share the list with the contractor. As items are finished, enter the date each one is reported corrected.
Back-check each corrected item on site and enter the date you verified it. The status turns Closed.
Filter by Responsible to give each trade its own list, or by Status to plan the next back-check.
Agradium keeps punch items by room and location, with correction dates and the architect's check-off at the end of the job, in the same record as the project's RFIs, submittals and changes.
Questions
Under most standard contracts, the contractor prepares the list of incomplete work when it considers the project substantially complete. The architect then inspects, adds what the contractor missed, and verifies each item once it is corrected.
Corrected is the contractor's word that an item is done. Verified is your confirmation on site. Keeping both dates shows which items are waiting for your back-check.
Yes. Each log tab prints in landscape, one page wide, with the column headings repeated on every page.
Excel workbook · 11 tabs
Every log in one workbook, with a summary of what is open, what is overdue and the contract sum to date.
Free download
Excel
Due dates, consultant hand-offs, days open and overdue flags, calculated for you.
Free download
Excel
Logged by spec section, item and revision, with review actions and review times.
Free download
A 30-minute walkthrough, from the first RFI to a signed change order.