A field report is the architect's written record of a site visit: who was there, what work was underway, what you observed, and what needs correcting. This site observation report has a place for each of those, an action item list and photo panels, ready to print or save as a PDF.
Only the report below prints. Add your letterhead and your firm's standard site visit statement.
| Name | Company | Role |
|---|---|---|
Trades on site and the work underway, by area or level.
What you saw, numbered, with room, grid line or detail references. Note anything that does not appear to follow the contract documents.
Questions for the contractor, items to confirm at the next visit, and submittals or RFIs the observations depend on.
Items the contractor needs to correct, carried to the next report until they are closed.
| # | Item | Location | Responsible | Corrected |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 |
Number each photo to match the observation it shows.
In Agradium, a field report stays a draft until you issue it. Issuing gives it a number and stores the PDF, with its photo pages, in your letterhead. Its action items move to an issues log that tracks each one until it is corrected. The open items appear at the next OAC meeting until each one is closed.
Questions
The architect's written record of a site visit during construction: the date, the conditions, who was present, the work in progress, what the architect observed, and any items the contractor needs to correct. It is sent to the owner and contractor and kept with the project record.
Usually not. Under most standard owner-architect agreements, the architect visits the site to become familiar with the progress and quality of the work and to report what is observed, not to inspect every part of it. The contractor stays responsible for construction means and methods and for safety. Use the wording your agreement uses, and add your firm's standard statement on the limits of a site visit to the report.
As often as your agreement with the owner requires, which is usually at intervals appropriate to the stage of construction or a set number of visits. Write a field report for every visit, even a short one: a visit without a report leaves nothing to point to later.
Excel workbook · 11 tabs
Every log in one workbook, with a summary of what is open, what is overdue and the contract sum to date.
Free download
Excel
Due dates, consultant hand-offs, days open and overdue flags, calculated for you.
Free download
Excel
Logged by spec section, item and revision, with review actions and review times.
Free download
A 30-minute walkthrough, from the first RFI to a signed change order.