Pre-Construction Meeting Agenda Template

The pre-construction meeting sets the rules for everything that follows: who talks to whom, how submittals and RFIs move, and how changes get priced and signed. This agenda covers each of those, with a sign-in sheet and an action item list, ready to print or save as a PDF.

Only the agenda below prints. Strike what doesn't apply.

Pre-Construction Meeting Agenda

Project
Project no.
Date
Time
Location
Called by
  1. 1.Introductions and project team

    • Introductions and sign-in
    • Key personnel for the owner, architect, consultants and contractor, and their duties
    • Lines of communication: who sends what to whom, and who can approve what
    • Project directory, including after-hours and emergency contacts
  2. 2.Contract documents

    • The agreement, conditions, drawings, specifications and addenda in force
    • How contract documents are distributed and how revisions are issued
    • Project software: where submittals, RFIs and project records are exchanged
  3. 3.Schedule

    • Notice to proceed, contract time and the substantial completion date
    • The contractor's construction schedule, phasing and critical sequences
    • Long-lead items and the submittals they depend on
    • Schedule updates and how delays are reported
  4. 4.Submittals

    • The submittal schedule and the order of review
    • Required format, transmittals, and the contractor's review before submitting
    • Review time, review actions and resubmittals
    • The substitution procedure
  5. 5.Requests for information

    • RFI format and numbering
    • Who sends RFIs, and to whom
    • Response time, and what happens when an answer affects cost or time
  6. 6.Changes to the work

    • Architect's supplemental instructions for changes with no cost or time
    • Proposal requests, and the contractor's pricing format and markups
    • Contractor's change order requests and their backup
    • Construction change directives
    • Change orders: who prepares them, who signs, and when work may proceed
  7. 7.Payment

    • Schedule of values
    • Applications for payment: cutoff date, draft review and certification
    • Retainage, lien waivers and stored materials
  8. 8.Site and field

    • The architect's site visits and field reports
    • Testing and inspections: who arranges them and who receives the reports
    • Working hours, site access, parking, staging and storage areas
    • Temporary facilities and utilities
    • Safety, security and first aid
    • Occupied areas, shutdowns and disruptions to the owner's operations
    • Progress cleaning, waste management and recycling
    • Moisture and mold control
  9. 9.Quality and closeout

    • Mock-ups and quality control
    • Sustainable design documentation, if the project requires it
    • Record drawings, kept current on site
    • Substantial completion: the punch list and inspection procedure
    • Closeout submittals: warranties, manuals, spare stock and owner training
  10. 10.Owner items

    • Owner-furnished items and the owner's separate contractors
    • Occupancy and move-in requirements
    • Insurance certificates and bonds
  11. 11.Close

    • Other items
    • Action item summary
    • OAC meeting schedule: day, time and location

Action items

#ItemResponsibleDue
1
2
3
4
5
6

Sign-in sheet

NameCompanyRoleEmailSignature
Next meeting
Minutes by

After the meeting

Agradium keeps OAC and pre-construction meetings with attendees, notes and action items, with the project they belong to. The procedures you agree on here are the ones your RFI, submittal and change order logs will follow.

Questions

Frequently asked questions

Who runs the pre-construction meeting?

It depends on the project. Many specifications have the architect schedule and run it, and others give that job to the contractor. Check Division 01 of your specifications. Whoever runs it, the owner, architect, contractor and key consultants and subcontractors should attend.

When is the pre-construction meeting held?

After the contract is signed and before work starts on site, usually around the notice to proceed. It needs to come early enough that the submittal schedule and long-lead items can still be settled.

What is the difference between a pre-construction meeting and an OAC meeting?

The pre-construction meeting happens once and sets the procedures for the whole project. OAC meetings follow on a regular schedule and track progress against those procedures: open RFIs, submittals, changes and the schedule.

Keep going

Guides

What Is an OAC Meeting? Agenda and Minutes

What an OAC (owner-architect-contractor) meeting is, who runs it, a standard agenda, how to write the minutes, and how action items carry forward.

6 min read

Excel workbook · 11 tabs

Construction Administration Log

Every log in one workbook, with a summary of what is open, what is overdue and the contract sum to date.

Free download

Excel

RFI Log

Due dates, consultant hand-offs, days open and overdue flags, calculated for you.

Free download

See your next project in Agradium.

A 30-minute walkthrough, from the first RFI to a signed change order.

Request a demo